Skip to main content

tv   [untitled]    January 8, 2013 11:30pm-12:00am PST

11:30 pm
they already had their presentations earlier this month. i was going to give you an update on our collective veterans hiring effort. i'm happy to say that we have two of our founding members in the room with us, manny flores and paula ressa of the carpenter's union. back in april we commenced a veteran's hiring steering committee, if you will, to look at issues of veterans geting into the construction field. we subsequently had two working group meetings with alameda workforce investment board, representatives, the edd there, as well as the carpenters' union and city build, as well as mission hiring hall. and what we came up with was essentially we found out that you needed to connect the dots with veterans hiring and a lot of organizations are out there
11:31 pm
working to support veterans, but nobody is really talking to each other and they are trying to individually reach out to employers and not really in a cohesive fashion. with unions and companies and cbos we needed to develop a more cohesive hiring process and that is what we worked on. we had a success story working closely with the carpenter's union, where we have two returning veterans, i think from afghanistan, to essentially pre-screened through a community-based organization -- out of a group of 75 possible veterans through a craigslist ad and got them in for an interview. liked their attitude, their demeanor, their work ethic. they are both former marines and hired them into --
11:32 pm
actually sponsored them and they went into the carpenter training pre-apprenticeship program and they could have skipped that and gone right in as an apprentice, but they wanted to see if they really liked the carpenter program. so this is a replicable hiring program that we're going to try to push out and we have been pushing out to other employers, other subcontractors on this project, as well as the construction industry in general. i think it's important to note that it's not just about hiring veterans. it's about retention. and making sure that they succeed. and so on that note we have actually been looking at ways to ensure that they are going to succeed. just as a best practices note from all the research i have done, we found that veterans need each other once they are back from their tours of duties.
11:33 pm
they actually should retain a cohort, which they can find of hang out with and be together. that is what we're attempting to create with this whole construction hiring process as a way for them to still, like there are so many jobs in the city that are coming down the pike, we want to make sure that they have a network to stay connected with each other. so on that note we're working with san francisco unified school district, as well as integrating veterans pre-orientation programs there. as well as the sf state university veterans club to generate internship paths into construction employers like webcor, turner, dbs and other employers. we can start with the transbay project and then move forward from there. so it's kind of a multi-pronged approach and still a work in progress. working with the unions, as well as the building trades to make sure that we have got them all aligned and identifying existing veterans in the union first, followed by any possible
11:34 pm
new-hires and beating the bushs to make sure that we get veterans integrated. kind of a lot to swallow, but i have a handout that outlines everything that we have done to-date. webcor obayashi has hired nine direct hire positions within our company. turner at the recent u.s. hornet career fair hired one and i think the key is developing the one-on-one relationships with the sourcing agencies to find the veterans that are out there and get them into internships or apprenticeship programs so they can be hired. so that is my summary. thanks. >> thank you. >> the one other item on the
11:35 pm
veteran's report that i wanted to highlight was that enville buildings was awarded the hoisting contract for the project. so they are going to be providing the man lifts to bring personnel into the excavation and in future to the upper-levels of transit center construction and the personnel to operate those. and that is a disabled veteran-owned business. so both in the field as contractors we're making end roads. just a few words on our apprenticeship programs. i reported last month that webcor had developed two tracking reports that we have now been using over the last four months as both a means of reporting, but also feedback to the operators and the contractors, so that in realtime they can make the
11:36 pm
adjustments necessary in the number of apprentices that they have on-site. the two reporting mechanisms for all crafts to achieve a 1:5 or 1:6 ratio of all workers, as apprentices. and you can see now that the crafts are achieving that and that is based on total hours worked. and then for operating engineers and for laborers, it's on a daily basis that we want to have a 1:4 ratio of apprentices to journeymen laborers. you can see there at the last few months, we have finally reached that point where those red lines representing the apprentices in the field are exceeding the apprenticeship
11:37 pm
targets. so these tools that were developed have given us the ability to really monitor the payroll on a daily basis and make the adjustments necessary to make sure that we're having as many apprentices in the field as possible. that concludes my report on the pla. >> could you just ask bob, are we going to be able to start seeing trade by trade apprentice? >> we have that data now. >> at least for the bigger trades. i know for very small number it's hard to meet, but it would we good to get a sense of who is having more challenges. >> we can break that out, absolutely. >> thank you. >> good morning directors, steve with turner construction. another good period of work put
11:38 pm
in place these last -- this last month. let's see if question get we can get this going. 561,000 craft hours through the end of november/early december. a little more than 11,000 since we last spoke. the hours represent about 160-200 workers in the field on any given day across multiple shifts that we're running. and later in the report, there is a tally. that is over a thousand unique jobs during the transit center construction including utilities. so that is craft people, a thousand craft people having worked or touched this project as reported in the certified payroll system. the sc contractor made their
11:39 pm
milestone of 162 and actually completed 165 and is on track to finish on on-time. the excavation continues and the rains that we had a week or so ago slowed things down with a little mud at the bottom of the excavation, but it continues to move west to east and under fremont street is the next step. the access trestle was completed all the way to fremont street. so the contractors now have a construction roadway, so to speak all the way out to howard at the end of the west end of the project. the awss work continues on mission street. they were able to get an exemption from the holiday moratorium to allow them to continue that work. so we'll finish that early part of next if year as they work through
11:40 pm
the holidays on mission continuing to put in the new water line. coming up next, the below-grade structure contractor who now has the geothermal and grounding contracts within their package will start that work in january. the buttress work will continue and the micro pile production, they completed 70 in the total production piles and that will hopefully be completed in the next 90 days and move into zone 2. of course the excavation will continue to work from west to east of the timeline update still remains the same.we're starting the below-grade package and superstructure package is out to bid and we'll get the results in early february. parts of the exterior packages will be going out with the window wall in 1st quarter/2nd
11:41 pm
quarter of next year and beyond. so that is the timeline on the bse and the big thing is the excavation continuing from the west to the east. the final traffic bridges will now be done over a weekend in april, after needing a lot of space in the zone 4 area to put those bridges together. the contractor has chosen to wait until the buttress work -- a majority of the buttress work is completed. just an overhead, you can see that the trustle bridge is connected all the way to fremont street and the other areas continue to be under excavation and the buttress area at the east end. this gives you a breakdown of how the excavation is going. the dark photo, left side
11:42 pm
indicates making the final depth and they are continuing that dealing with the de-watering aspects from the rain and moves from west to east. so just some perspectives of how things have changed. you can see how the trest the bridge is now connected. hard to tell, but the ab and c levels are in place in zones 1 and 2 and at far end, all the way down to the d level. just a shot of some of the excavation and bracing going on and the conditions which the contractor is working under right now in zone 1. micro piles continue. they have 70 completed to-date, or by the end of november. installing bracing, under the
11:43 pm
1st street bridge between zones 2 and 3. completing the trestle in zone 3. and excavation and bracing in zone 3 as it progresses along. the end section, the east end section, zone 4 buttress work continues. as i said they met the milestone of 162 and actually had 165 completed and continuing to get 2.5 a week. up-to-date progress chart and you can see on the chart kept by the program management folks, the team was right on target for the completion of the buttress work. a couple of the buttresses being worked on over of the last period. the contractor has elected to put in a sheet pile cutoff wall in the north-south division on division between zones 2 and 3 on eastside of the fremont street.
11:44 pm
this will allow them to start the excavation underneath the fremont street bridge and start moving into that zone 4 portion of that zone 4 excavation early before the completion of buttress work. so that shoring wall went in or that cutoff wall went in this last period and will allow them to start excavating under the bridge. the awss work continues. as i mentioned there is just a couple of shots of the work progressing on mission street and the integral work around the other utilitis in the streets. so next up is the substructure package as i mentioned. so we'll just walk through that real quick. the shoring walls are already completed. you might have seen the slides before, the water table. the next step is the micro piles and there are a total of close to 1800 of them, the length of the project, but as they are completed the contractor, who is starting with the grounding and geothermal in january, underneath this will be installing the 5' thick piece
11:45 pm
of concrete. then the below-grade structure and the walls and the foundation or structural walls and of course, eventually we'll get the steel out there to the superstructure. just the overall budget, which remains consistent for the construction work that has let. this is the overall construction budget of commitments to-date-560,000 craft hours. and you can see here that san francisco labor still continues to hold at 20% throughout the project. these are just counting the utility hours and transit center construction hours. and again, there is that number, over a thousand craft jobs over the course of the start of the transit center work and utility work. if i can answer any questions? all right. thank you. >> thank you, directors, that concludes my report.
11:46 pm
>> thank you. can we move on to the next item, please? >> yes item 6 is public comment, can which an opportunity for members of public to address the authority on matters that are not on today's calendar and gilbert deanza would like to address you. >> if there are any other members who wish to speak, if you could stand and speak after gilbert, thank you. >> good morning. madame chairman, board, maria, i am here to talk about the carpenters agreement with john o'connell. we recently signed an mou stating that the carpenter's union will hire students graduating from the john o'connell program. i am also a graduate of john o'connell and it's been a great
11:47 pm
career for me. i think it's a great thing for the relationship we have formed with the school district. we met with october and signed the agreement in which five graduating students from john o'connell will come into direct entry into the carpenter's program and two of them will be females, which is great. and we're very excited about going forward with this. paula will be getting together with the john o'connell school and providing the curriculum in which the students graduating have direct entry into the carpenter's join. i also want to say that we'll be having a college and career awareness day next thursday, december 19th. so that is the late update with the carpenters thank you. >> where will that take place? >> ida b. wells high school next thursday. >> thank you so much. >> thank you so much, have a
11:48 pm
great day. >> and if there are any other members of public that would like to speak, please do just line up. >> hi. i am jim patrick, patrick and company in san francisco. i want to go to the agreet agreement with heins. i would like to find out the bullet points. what are the responsibilities and deals made there? to the best of my knowledge is not a public record and wondering if it will be a public record ? thank you. >> thank you. if there are no other members of public that will like to speak, we'll close public comment at this time. [ gavel ] and we'll move on to the regular calendar. >> item no. 17 a presentation of the audited financial statements for the fiscal year ended june 30 120 [#20*-/] 12 and the report to the board of directors. >> thank you. >> and director sarah will
11:49 pm
present this item. >> good morning again directors. you have been presented with our annual financial report and i am of course pleased that we have again received an unqualified clean opinion. i do want to acknowledge the other tjpa financial staff that you haven't met. they are not at our meetings, but they are instrumental in making sure that we maintain our financial symptom throughout the year and that we're able to produce these statements. and with, that i want to introduce our auditor ahmad >> i am the partner in charge of the audit. what you see here is the annual financial statement the tjpa. as required by government accounting standards board we are required to audit the financial statements and ensure that the financial statements are fairly presented. because you are a governmental agency as well, we do extra work as it relates to further
11:50 pm
compliance because you are major recipients of federal grants, as well as the fact that we have to report in a separate opinion, internal control deficiencies and we're reported to report these items on the financial statements that you see here. what you really see in the financial statements is just basically a mirror of the financial statements that the management had presented to you. there were no audit adjustments, we didn't change any of those numbers and vouched them back to what we call external documents or external evidence, verifying that the financial information is fairly stated. as a mentioned before we're required to also report to you in these financial statements if we noted any non-compliance with laws and regulations and we noted no find of non-compliance with laws and regulations.
11:51 pm
with the specific tests that we go into, we verify the compliance with the federal requirements so we know there are no exceptions. we look at the interrible controls internal controls and payroll internally and look the controls and we have noted no deficiencies in internal control. we are required to communicate to you whether we noted any difficultis in the performance of the audit or whether we noted a audit adjustments, which is the second letter in the package that you have. we noted -- we proposed no audit adjustments. management has been one step forward giving us all the financial information that we needed to complete our audit and for that we thank management staff. i would be happy to answer any questions? >> are there any questions? if not, thank you for the report and the presentation.
11:52 pm
seeing no questions, can we move to our next and last item? >> yes. item no. 8 is the approval of the minutes of november 19, 2012 meeting. >> i have to abstain. >> we have a motion and a second. >> we'll take a roll call vote. director lloyd? >> aye. >> director mett kav? metcalf? >> aye. >> we'll have to carry this forward. >> so we'll take a motion to continue this item to the next board meeting. >> so moved. >> we have a motion and i believe we can do that -- >> what will change next time? >> the two will always abstain because they weren't here. >> i wasn't able to attend the meeting. >> what will change? >> i apologize.
11:53 pm
>> so you may review the meeting minutes that are available online and confirm that the meeting minutes accurately reflect the activity. >> okay. >> >> so we have a motion to continue this item until january and we will do so without opposition. do we have any other items to review? >> that does conclude your agenda today. >> meeting adjourned and happy holidays to everybody. [ gavel ]
11:54 pm
>> hello, i am with the san francisco parks department serious we are featuring some wonderful locations in your and very own backyard. this is your chance to find your heart in san francisco with someone special. we are here at the lovely and historic palace of fine arts, located in the bustling marina district. originally built for the 1950's exposition, the palace is situated along san francisco's
11:55 pm
waterfront. it is ada accessible and is reached by the 28, 30, and 91 bus lines. with its rotunda, columns, uncut the reflecting waters against the eucalyptus trees, it is one of the most romantic settings for special dates, and memorable proposals. it is also a perfect spot where you can relax with that special someone while listening to the water and fountain in the lagoon. beautiful to view from many locations, and inside is an ideal place to walk around with your loved ones. the palace is the most popular wedding location in the city park system. reservations for weddings and other events are available at strecpark.org.
11:56 pm
shakespeares' guard and refers -- has plants referred to in shakespeare's plays and poems. located near the museum and the california academy of sciences, shakespeares garden was designed in 1928 by the california spring blossom association. flowers and plants played an important part in shakespeares literary masterpieces. here is an enchanting and tranquil garden tucked away along a path behind a charming gate. this garden is the spot to woo your date. appreciate the beauty of its unique setting. the cherry tree, the brick walkways, the enchanting stones, the rustic sundial.
11:57 pm
chaired the bards'w ro -- share the bard's words. the garden is a gem to share with someone special. pack a picnic, find a bench, enjoy the sunshine and let the whimsical words of william shakespeare float you and your loved one away. this is one of the most popular wedding locations and is available for reservations. shakespeares garden is 8ada accessible. this park is located at the bottom of a hill. it is a secret garden with an infinite and captivating appeal. carefully tucked away, one block from the bottom of lombard street, it makes the top of our
11:58 pm
list for the most intimate picnic settings. avoid all tourist cars and parking hassles by hopping on the cable car. or the 30, 45, 41, or 91 bus. this garden was designed by a the landscape architect thomas church in 19 to -- 1957. grow old with me, the best is yet to be is inscribed at this gem of a park. a lush oasis anchored by gazebosanchoreddekcs, -- gazebos, anchored by decks. this is the place to tell your family the love you share. reservations are available for this hidden gem.
11:59 pm
i am jamie hopper. until next time, don't forget to get out and play. for more information about reserving one of these romantic locations, or any other location, call 831-5500. this number is best for special events, weddings, picnics, and the county fair building. for any athletic fields and neighborhood parks, 831-5510. you can also write us. 501 san francisco, calif. 94117. or just walk in and say hello. and of course you can find more information and reach us at sfrecpark.org.